Upgrading Grolloo gas site

Vermilion Oil & Gas commissioned Visser & Smit Hanab for the engineering and construction required as part of the mechanical and civil engineering work necessary to upgrade the Grolloo gas site.

The project comprised laying the foundations for the compressor and cooler, installing the compressor and cooler, managing the E&I subcontractor, prefabricating and laying the pipelines, along with testing, insulating and commissioning the entire system.

 

Installing the container and pressure vessel and pump contained therein in a limited space was a real challenge. After considering a number of alternatives with all parties involved, the installation took place without a hitch in the end.